6:30 pm study session, An opportunity to ask question and for most people the first opportunity to see the six volume plan and DEIR which is a stack over inches high. The formal Hearing starts at 7:30 PM where you will have only 3 minutes to comment on the million word study which you probability have not seen until the meeting.
Note this is not the complete Master plan approved by the
Airport. LAWA released the text (no graphics or letters commenting on the plan)
in 1997 to us.
|
![]() |
Volume Five Executive summary
Volume One Description/Need for the Proposed
Project
Volume Two
EIR Environmental Issues
Master plan Part 1
The DEIR Volume 1 - Description/Need for the Proposed
project
Volume Three Alternates
Alternate A
Alternate B
Alternate C
Alternate D
Alternate E2
Alternate E3
Volume Four
Volume Six LAWA just released it in PDF form here is a link will convert to
HTML later. No online copy exists. After multiple requests LAWA refuses to
provide on a copy or place it on their website
The Vanguard News down loaded (2-4-97) the EIR files from the BOAC site (since closed). What we got was a number of unconnected files. We have converted some of them to HTML and index them. We have tried to be as careful as possible but we want you to know these are not the official files and are provided for information only.
Disclaimer by and the City of Los Angeles, Department of Airports ("DOA")
p>The text, graphics and information provided herein are provided as a convenience for informational purposes only. The material in this site could include inaccuracies or typographical errors and the City of Los Angeles, Department of Airports ("DOA") may make changes, corrections or modifications at any time without notice.The materials on this site are provided "AS IS" and without warranties of any kind, express or implied and, to the fullest extent permitted pursuant to applicable law, the DOA disclaims all warranties of merchantability and fitness for a particular purpose. Before relying upon any text, graphics or information contained herein, persons should examine the Van Nuys Master Plan document on file with the DOA.
The DOA does not warrant that the functions and/or information contained in the material will be accurate, complete or error-free.
The DOA shall not be responsible or liable to any person or entity whomsoever (including, without limitation, persons who may use such materials) for any loss, damage (whether actual, consequential, punitive, or otherwise), injury, claim, liability, or other cause of any kind of character whatsoever based upon or resulting from any material provided by DOA whether resulting from errors in or omissions from such material, any use of any material by any third party, or the content of such material or otherwise.